{"id":955525,"date":"2026-04-12T15:22:00","date_gmt":"2026-04-12T13:22:00","guid":{"rendered":"https:\/\/gradski.me\/?p=955525"},"modified":"2026-04-12T14:42:26","modified_gmt":"2026-04-12T12:42:26","slug":"auto-putem-od-pocetka-godine-proslo-70414-hiljada-vozila","status":"publish","type":"post","link":"https:\/\/gradski.me\/en\/ekonomija\/auto-putem-od-pocetka-godine-proslo-70414-hiljada-vozila\/","title":{"rendered":"704.14 thousand vehicles have passed along the highway since the beginning of the year"},"content":{"rendered":"<p><br><br><\/p>\n\n\n\n<p>Last year, 3.2 million vehicles passed along the highway, in 2024 2.87 million, in 2023 2.29 million, and in 2022 1.14 million.<\/p>\n\n\n\n<p>The priority section of the Bar-Boljare highway was ceremonially opened on July 13, 2022, and was opened to traffic the following day.<\/p>\n\n\n\n<p>Prvih sedam dana putarina je bila besplatna. Nakon toga, ona za motore iznosi 1,5 eura, za putni\u010dka vozila 3,5 eura, a za kamione i autobuse 17 eura.<\/p>\n\n\n\n<p>The total length of the first section of the highway is 41.5 kilometers, with 20 bridges on the main route, nine bridges on the interchange ramps, two overpasses, eight underpasses, 7.2 kilometers of concrete walls, as well as 16 double-tube tunnels.<\/p>\n\n\n\n<p>The section has four interchanges, with toll plazas, where the highway connects to the existing state, namely Smokovac, Pelev Brijeg, Veru\u0161a and Mate\u0161evo.<\/p>\n\n\n\n<p>The maximum speed is limited to 100 kilometers per hour.<\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Auto-putem Princeza Ksenija je od po\u010detka godine pro\u0161lo 704,14 hiljada vozila, pokazuju podaci sa sajta Monteputa, prenosi MINA-business.<\/p>","protected":false},"author":5,"featured_media":923753,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[8],"tags":[30496,27982,2816],"naslovna":[],"class_list":["post-955525","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ekonomija","tag-704-14-hiljada","tag-automobila","tag-autoput"],"acf":[],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/posts\/955525","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/comments?post=955525"}],"version-history":[{"count":1,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/posts\/955525\/revisions"}],"predecessor-version":[{"id":955526,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/posts\/955525\/revisions\/955526"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/media\/923753"}],"wp:attachment":[{"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/media?parent=955525"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/categories?post=955525"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/tags?post=955525"},{"taxonomy":"naslovna","embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/naslovna?post=955525"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}