{"id":948887,"date":"2026-03-30T15:44:00","date_gmt":"2026-03-30T13:44:00","guid":{"rendered":"https:\/\/gradski.me\/?p=948887"},"modified":"2026-03-30T15:16:06","modified_gmt":"2026-03-30T13:16:06","slug":"opstina-tivat-zavrseni-radovi-na-jacanju-vodovodne-mreze-u-maricima-pod-kuku-i-mazini","status":"publish","type":"post","link":"https:\/\/gradski.me\/en\/drustvo\/opstina-tivat-zavrseni-radovi-na-jacanju-vodovodne-mreze-u-maricima-pod-kuku-i-mazini\/","title":{"rendered":"Municipality of Tivat: Completed works on strengthening the water supply network in Mari\u0107i, Pod Kuku and Ma\u017eina"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As they stated, the works on connecting the water reservoirs Pod Kuk and Ma\u017eina, worth 35,000 euros, have also been completed, which is a long-term solution to the problems with pressure and water supply in these Tivat settlements located at higher elevations. The works were carried out by \"Vigoris Ecotech\" doo and represent a continuation of the investment from 2025, when around 550,000 euros were spent on connecting the two reservoirs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Work is underway to replace existing water pipes in several streets in Kra\u0161i\u0107i.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"The Spatial Planning Program for 2026 plans investments in the reconstruction and expansion of the water supply and sewage system, and just some of the planned projects are: construction of a secondary water supply and sewage network in Radovi\u0107i, works to replace the existing water supply network at several locations in Tivat, and continuation of activities on the project 'Water Supply and Wastewater Disposal on the Adriatic Coast - Phase V, Component 2',\" the statement added.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In connection with the V-2 project, the Municipality of Tivat is intensively dealing with property and other issues on the route of the future water supply and sewage network in Gradio\u0161nica and Donja Lastva. 9.5 million euros of grants from the European Joint Fund for the Western Balkans have been provided for this project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"A contract worth 26 million euros is expected to be signed with the company \"Jedinstvo\" as the contractor. New environmental impact studies are also being prepared. The Investment Directorate notes that the documentation for the reconstruction of the main collector through Donja Lastva and Seljanovo is ready, and the start of work is expected after the tourist season,\" the Municipality of Tivat concludes.<\/p>","protected":false},"excerpt":{"rendered":"<p>The construction of the secondary sewage and water supply network in Mari\u0107i was completed last week. The total investment value was 216,000 euros, and the works were carried out by the consortium \"Zevs gradnja\" doo, \"Aqua Engineering\" doo and \"Geotin Mne\" doo, the Municipality of Tivat announced.<\/p>","protected":false},"author":19,"featured_media":948888,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9],"tags":[159,23927],"naslovna":[],"class_list":["post-948887","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-drustvo","tag-tivat","tag-vodovodna-mreza"],"acf":[],"_links":{"self":[{"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/posts\/948887","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/comments?post=948887"}],"version-history":[{"count":1,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/posts\/948887\/revisions"}],"predecessor-version":[{"id":948891,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/posts\/948887\/revisions\/948891"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/media\/948888"}],"wp:attachment":[{"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/media?parent=948887"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/categories?post=948887"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/tags?post=948887"},{"taxonomy":"naslovna","embeddable":true,"href":"https:\/\/gradski.me\/en\/wp-json\/wp\/v2\/naslovna?post=948887"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}